1
Combustion air, clearances, and venting in the utility room
The report says its boiler inspection typically includes
adequate combustion air and records no finding p. 36. It does not describe the room's size, the combustion air supply, the clearances, or the venting of the boiler p. 37 or the 2016 gas water heater pp. 39–40. Its standards do not require combustion air evaluation.
- Ask
- The HVAC contractor to confirm all four in writing; the chimney professional to name every appliance on the chimney.
2
Gas piping inside the house
The report lists the fuel system as inspected p. 39, the fuel as propane p. 35, and the shutoff At Tank
p. 40. It does not describe the gas piping inside the house.
- Ask
- The plumber evaluating the gas line near the washing machine p. 57 to confirm the piping material and connections.
3
How much of this house is from 1874
The report records an 1874 build date p. 8, a masonry block foundation and plywood subfloor p. 28, and plywood roof sheathing p. 60. The report notes additions and/or modifications
p. 7. What they are, when they were done and whether they were permitted are questions for the seller and the permit office.
- Ask
- The seller for the history; the permit office for the record.
4
The floor framing over the crawlspace
The report found Standing pools (small) of water and condensation
in the crawlspace p. 30. The report gives no moisture readings for the floor framing above the crawlspace; whether there are any is a question for the contractor who opens it up.
- Ask
- The crawlspace or drainage contractor, if called, to check the framing and the band joist insulation p. 59.
5
The well equipment
The report records a well and a high-flow house filter p. 39 and nothing about the pump, pressure tank, or flow; its standards do not require it.
- Ask
- A well contractor about the pump and tank, with the water test.